by admin | Jan 23, 2017 | Uncategorized
In 2013, Grandastur installed one of the world’s first Otis Gen2 elevators. The contract was signed by the delegation of Otis in Avilés with our company, which together with the study of vertical architecture elevation, has made a BEX creation project for a...